Reference Projects
ESTEC SUPPLIES AND CONSTRUCTS ELECTRICAL SYSTEM - AUTOMATION CONTROL FOR SUN WORLD WATER PARK SAM SON - THANH HOA
Customer name: SunGroup Corporation
Project implementation location: Sun World Sam Son Water Park.
Project implementation time: 2024
SUPPLY INSTALLATION OF ELECTRICAL CONTROL SYSTEM FOR SUNGROUP
Customer name: SunGroup Corporation
Project implementation location: Pearl Island Phu Quoc
Project implementation time: 2021-2022
AIR LIQUIDE INDUSTRIAL GAS FACTORY EXPAND PROJECT
Customer name: AIR LIQUIDE VIETNAM CO., LTD
Project implementation location: Saigon Hi-Tech Park, District 9, City. Thu Duc, Ho Chi Minh
Project implementation time: 2021-2022
SUPPLY INDUSTRIAL WEIGHT WEIGHT
Customer name: Doosan Vina Heavy Industry Co., Ltd
Customer address: Dung Quat Economic Zone, Binh Thuan Commune, Binh Son District, Quang Ngai Province, Vietnam
Industry: Manufacture of heavy industrial equipment.
Implementation time: 2022
SUPPLY CONTROL BOX, PROGRAMMING CONTROL & MONITORING SYSTEMS
Investor: CMC Telecom Client's
Project location: District 7, Ho Chi Minh City
Project implementation time: 2021
MESSER-H PLANT WITH CATALYTIC HOT OIL SYSTEM
Customer name: Messer Gasses Industrial Gas
Company Industry: Liquefied Petroleum Gas
Project implementation location: Thai Nguyen. Implementation time: 2022
WINCC OA SOFTWARE LICENSE SUPPLY – SAMSUNG SDS VIETNAM
Customer name: SAMSUNG SDS VIETNAM CO., LTD
Project implementation location: Bien Hoa City, Dong Nai
Project implementation time: 2021
ESTEC provides the WinCC OA software license from Siemens and design and programming services to monitor power consumption, capacity and information of the entire plant. The system gives visual warnings and error statuses to help operators check the status and have a timely handling plan.
ENERGY MANAGEMENT SYSTEM FOR VINAMILK DAIRY FARM
- Customer name: Vietnam Dairy Cow One Member Company Limited (VINAMILK)
- Customer's address: 10 Tan Trao, Tan Phu ward, district 7, HCMC
- Industry: Food & Beverage (Food & Beverage) - Project implementation location: Mo Duc - Quang Ngai
- Project implementation time: 2021-2022
ESTEC HAD SUPPLIED AND INSTALLED FLENDER GEARBOX
End User: Hon Chong INSEE
Year: 2019, 2021
Scope of Work: In 2019 , 2021; ESTEC had supplied and installed Flender gearbox.
ELECTRICAL CABLE AND CONTROL PANELPAINT FINISHING TECHNOLOGY & SYSTEM
Project Introduction:
- Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
- Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.
UPGRADE HARDWARE S5 TO S7 FOR STATIONS IP71, IP72
Project Introduction
- Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
- Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.
CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) - OUTSPAN
Investor: CAFé OUTSPAN VIETNAM LIMITED
Location: Lot L1, Nhut Chanh Industrial Park, Nhut Chanh Commune, Ben Luc District, Long An
Industry: Food & Beverage
Year: 2019
Scope: ESTEC designs, supplies equipment, constructs, monitoring system
MESSER DUNG QUAT PROJECT
Investor: Messer Dung Quat
Location: Dung Quat - Quang Ngai
Year: 2019
Scope: Constructs and installation of medium voltage, low voltage systems (MV, LV, M & E), DCS control system, measuring equipment And supply equipment: Cable tray, Cable control and lighting systems, lightning protection, earthing
HON THOM WATER PARK PROJECT
Investor: Sun Group
Location: Hon Thom - Phu Quoc
Year: 2019
Scope:
Contractor must provide good technical solutions, high quality of products & services with competitive price for electrical and control system, instrumentation for water games and water treatment plant. Main equipment such as PLC, HMI, VSD, CB, Contactor, Electrical enclosure, instrumentation must be EU/G7 brand names. High quality of hardware and software engineering
PROJECT COOLING WATER MAKE UP
End User: PVFCCo
Contractor: ALPHA ECC - GR INDTECH
Location: Phú Mỹ, Bà Rịa - Vũng Tàu
Year: 2016
Scope of Work: ESTEC consulting and providing to PVFCCo using WinCC and PLC S7-400H apply to water filtration process in order to supply cooling water for production.
UPGRADE CONTROLLER CEMAT - INSEE THI VAI
Investor: INSEE Thi Vai Terminal
Location: Phu My, Ba Ria Vung Tau
Year: 2017
Scope:Upgrade CEMATControllor
TRANSFORMER OIL RE-GENERATION SERVICES - PHU MY 3 BOT POWER
Investor: Phu My BOT Power Company
Location: Phu My, Ba Ria
Contractor: Siemens EM
Year: 2018
Scope: Provision of Transformer Oil Re-generation services (Sitram-Reg)
PCS7 UPGRADE - LAM DONG ALUMINUM
Investor: Lam Dong Aluminum
Location: Tan Rai, Lam Dong
Year: 2017
Scope: Upgrade Simatic PCS7 Coal Gas Workshop
CONTROL PANELS & MCC PANELS - SSE
Investor: SSE
Location: Hải Phòng
Year: 2018
Scope: Control Panels and MCC Panels
LPG SYSTEM UPGRADE - TOTAL
Investor: Total
EPC: TTCL
Location: Go Dau, Dong Nai
Year: 2017
Scope: LPG System Upgrade
SUPPLYING EQUIPMENT AND CONTROL PRODUCTION OPERATION SYSTEM
Investor: GreenFeed
Location: Vinh Long
Year: 2018
Scope: ESTEC consulting and providing to GreenFeed using TIA Portal V14 SP1 and SIMATIC S7-1500, ET200SP apply to monitor and control the production operation system, production reports for GreenFeed Vinh Long factory.
PERSONAL CARE PLANT 05TON MIXER – UNILEVER
Investor: Unilever
Location: Personal Care Plant, Cu Chi, HCMC
Year: 2014-2015
Scope: Control Cabinet, MCC; Local Cabling Control Cabinel
SAFETY SYSTEM, FIRE AND GAS PROTECTION SYSTEM - STN CLJOC
Investor: Cuu Long JOC
Contractor: PVDT
Year: 2014
Scope: Safety system, fire and gas projection system for generator at STN
VAM INTERLOCK SAFETY SYSTEM - SYNTHOMER
Investor: Synthomer
Location: Song Than IZ, Binh Duong
Year: 2017
Scope: Safety PLC Panel
HOME CARE LIQUID PHASE 3 - UNILEVER
Investor: Unilever
Location: Cu Chi, Ho Chi Minh City
Year: 2014-2015
Scope: Upgrade DCS and Batching System at Personal Care Plant
SUPPLYING CONTROL SYSTEM AND INSTRUMENTATION FOR BMS - TETRA PAK
Investor: Tetra Pak
Location: Binh Duong
Year: 2018
Scope: ESTEC providing field equipment, sensors and BMS control system for the factory using TIA Portal V14 SP1 and PLC S7-1500 and SCADA Webfactory software to manage and optimize energy to ensure LEED certificate.
WASTE WATER TREATMENT PLANT - YKK
Investor: YKK
Contractor: Kobelco
Location: Nhon Trach, Dong Nai
Year: 2016
Scope: Supplied and installed control system and MCC system for Water Treatment Plant
AUTOMATION SYSTEM – PLC & SCADA DAP 2
Investor: DAP 2 LAO CAI PLANT
Contractor: TVC
Year: 2014
Scope: CONTROL SYSTEM FOR DEMIN WATER STATION
PROCESS CONTROL SYSTEMS - MESSER
Investor: Messer Industrial Gasses Limited - Hai Phong
Location: Hai Duong
Year: 2015-2016
Scope: Process Control Systems
DCS SYSTEM FOR BUT SON CEMENT PLANT
Investor: Vicem But Son Cement
Location: Kim Bang, Ha Nam
Year: 2016
Scope: Upgraded control system software CEMAT V7; Upgraded weight scale and flow meter systems.
MESSER-H PLANT WITH CATALYTIC HOT OIL SYSTEM
Customer name: Messer Gasses Industrial Gas
Company Industry: Liquefied Petroleum Gas
Project implementation location: Thai Nguyen. Implementation time: 2022
PROJECT COOLING WATER MAKE UP
End User: PVFCCo
Contractor: ALPHA ECC - GR INDTECH
Location: Phú Mỹ, Bà Rịa - Vũng Tàu
Year: 2016
Scope of Work: ESTEC consulting and providing to PVFCCo using WinCC and PLC S7-400H apply to water filtration process in order to supply cooling water for production.
LPG SYSTEM UPGRADE - TOTAL
Investor: Total
EPC: TTCL
Location: Go Dau, Dong Nai
Year: 2017
Scope: LPG System Upgrade
SAFETY SYSTEM, FIRE AND GAS PROTECTION SYSTEM - STN CLJOC
Investor: Cuu Long JOC
Contractor: PVDT
Year: 2014
Scope: Safety system, fire and gas projection system for generator at STN
PROCESS CONTROL SYSTEMS - MESSER
Investor: Messer Industrial Gasses Limited - Hai Phong
Location: Hai Duong
Year: 2015-2016
Scope: Process Control Systems
AIR LIQUIDE INDUSTRIAL GAS FACTORY EXPAND PROJECT
Customer name: AIR LIQUIDE VIETNAM CO., LTD
Project implementation location: Saigon Hi-Tech Park, District 9, City. Thu Duc, Ho Chi Minh
Project implementation time: 2021-2022
ELECTRICAL CABLE AND CONTROL PANELPAINT FINISHING TECHNOLOGY & SYSTEM
Project Introduction:
- Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
- Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.
MESSER DUNG QUAT PROJECT
Investor: Messer Dung Quat
Location: Dung Quat - Quang Ngai
Year: 2019
Scope: Constructs and installation of medium voltage, low voltage systems (MV, LV, M & E), DCS control system, measuring equipment And supply equipment: Cable tray, Cable control and lighting systems, lightning protection, earthing
VAM INTERLOCK SAFETY SYSTEM - SYNTHOMER
Investor: Synthomer
Location: Song Than IZ, Binh Duong
Year: 2017
Scope: Safety PLC Panel
AUTOMATION SYSTEM – PLC & SCADA DAP 2
Investor: DAP 2 LAO CAI PLANT
Contractor: TVC
Year: 2014
Scope: CONTROL SYSTEM FOR DEMIN WATER STATION
ESTEC SUPPLIES AND CONSTRUCTS ELECTRICAL SYSTEM - AUTOMATION CONTROL FOR SUN WORLD WATER PARK SAM SON - THANH HOA
Customer name: SunGroup Corporation
Project implementation location: Sun World Sam Son Water Park.
Project implementation time: 2024
SUPPLY INSTALLATION OF ELECTRICAL CONTROL SYSTEM FOR SUNGROUP
Customer name: SunGroup Corporation
Project implementation location: Pearl Island Phu Quoc
Project implementation time: 2021-2022
SUPPLY CONTROL BOX, PROGRAMMING CONTROL & MONITORING SYSTEMS
Investor: CMC Telecom Client's
Project location: District 7, Ho Chi Minh City
Project implementation time: 2021
WINCC OA SOFTWARE LICENSE SUPPLY – SAMSUNG SDS VIETNAM
Customer name: SAMSUNG SDS VIETNAM CO., LTD
Project implementation location: Bien Hoa City, Dong Nai
Project implementation time: 2021
ESTEC provides the WinCC OA software license from Siemens and design and programming services to monitor power consumption, capacity and information of the entire plant. The system gives visual warnings and error statuses to help operators check the status and have a timely handling plan.
TRANSFORMER OIL RE-GENERATION SERVICES - PHU MY 3 BOT POWER
Investor: Phu My BOT Power Company
Location: Phu My, Ba Ria
Contractor: Siemens EM
Year: 2018
Scope: Provision of Transformer Oil Re-generation services (Sitram-Reg)
ESTEC HAD SUPPLIED AND INSTALLED FLENDER GEARBOX
End User: Hon Chong INSEE
Year: 2019, 2021
Scope of Work: In 2019 , 2021; ESTEC had supplied and installed Flender gearbox.
UPGRADE HARDWARE S5 TO S7 FOR STATIONS IP71, IP72
Project Introduction
- Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
- Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.
UPGRADE CONTROLLER CEMAT - INSEE THI VAI
Investor: INSEE Thi Vai Terminal
Location: Phu My, Ba Ria Vung Tau
Year: 2017
Scope:Upgrade CEMATControllor
PCS7 UPGRADE - LAM DONG ALUMINUM
Investor: Lam Dong Aluminum
Location: Tan Rai, Lam Dong
Year: 2017
Scope: Upgrade Simatic PCS7 Coal Gas Workshop
DCS SYSTEM FOR BUT SON CEMENT PLANT
Investor: Vicem But Son Cement
Location: Kim Bang, Ha Nam
Year: 2016
Scope: Upgraded control system software CEMAT V7; Upgraded weight scale and flow meter systems.
CONTROL PANELS & MCC PANELS - SSE
Investor: SSE
Location: Hải Phòng
Year: 2018
Scope: Control Panels and MCC Panels
PERSONAL CARE PLANT 05TON MIXER – UNILEVER
Investor: Unilever
Location: Personal Care Plant, Cu Chi, HCMC
Year: 2014-2015
Scope: Control Cabinet, MCC; Local Cabling Control Cabinel
HOME CARE LIQUID PHASE 3 - UNILEVER
Investor: Unilever
Location: Cu Chi, Ho Chi Minh City
Year: 2014-2015
Scope: Upgrade DCS and Batching System at Personal Care Plant
ENERGY MANAGEMENT SYSTEM FOR VINAMILK DAIRY FARM
- Customer name: Vietnam Dairy Cow One Member Company Limited (VINAMILK)
- Customer's address: 10 Tan Trao, Tan Phu ward, district 7, HCMC
- Industry: Food & Beverage (Food & Beverage) - Project implementation location: Mo Duc - Quang Ngai
- Project implementation time: 2021-2022
CONTINUOUS EMISSION MONITORING SYSTEM (CEMS) - OUTSPAN
Investor: CAFé OUTSPAN VIETNAM LIMITED
Location: Lot L1, Nhut Chanh Industrial Park, Nhut Chanh Commune, Ben Luc District, Long An
Industry: Food & Beverage
Year: 2019
Scope: ESTEC designs, supplies equipment, constructs, monitoring system
SUPPLYING EQUIPMENT AND CONTROL PRODUCTION OPERATION SYSTEM
Investor: GreenFeed
Location: Vinh Long
Year: 2018
Scope: ESTEC consulting and providing to GreenFeed using TIA Portal V14 SP1 and SIMATIC S7-1500, ET200SP apply to monitor and control the production operation system, production reports for GreenFeed Vinh Long factory.
SUPPLYING CONTROL SYSTEM AND INSTRUMENTATION FOR BMS - TETRA PAK
Investor: Tetra Pak
Location: Binh Duong
Year: 2018
Scope: ESTEC providing field equipment, sensors and BMS control system for the factory using TIA Portal V14 SP1 and PLC S7-1500 and SCADA Webfactory software to manage and optimize energy to ensure LEED certificate.
WASTE WATER TREATMENT PLANT - YKK
Investor: YKK
Contractor: Kobelco
Location: Nhon Trach, Dong Nai
Year: 2016
Scope: Supplied and installed control system and MCC system for Water Treatment Plant
SUPPLY AND INSTALL XHQ OPERATIONS INTELLIGENCE SOFTWARE
Customer name: Vicem Ha Tien Cement Joint Stock Company
Industry: Cement
Project implementation location: Binh Phuoc.
Project implementation time: 2021-2022
SUPPLY AND INSTALL XHQ OPERATIONS INTELLIGENCE SOFTWARE
Customer name: Vicem Ha Tien Cement Joint Stock Company
Industry: Cement
Project implementation location: Binh Phuoc.
Project implementation time: 2021-2022
SERVICE OF HENTING PROFESSIONALS FOR SUPERVISION AND MAINTENANCE
Customer name: BRANCH OF VICEM HA TIEN Cement Joint Stock Company - BINH PHUC Cement Factory
Industry: Cement
Location: Thanh Binh Hamlet, Thanh Luong Commune, Binh Long Town, Binh Phuoc Province, Vietnam
Project implementation time: 2023
UPGRADING 80T TRUCK SCALELAM DONG ALUMIN PLANT
Project Introduction:
- Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
- Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.
REPAIR OF GEAR BOX FOR MILL AT HA TIEN 1 PHU HUU
Investor: Xi Măng Hà Tiên 1
Location: Phú Hữu, TP. Hồ Chí Minh
Year: 7/2016
REMOTE MONITORING FOR GEAR UNITS
• Optimal for demanding applications such as cement, cranes, mining.
• Monitoring of complex drive trains
• Online data collection and recording
• Transfer of measured data to our Expert Center by secure data communication
• Qualified data analysis and diagnosis by our competent expert team
• Concrete action recommendations as well as early warnings in the event of failure
TRAINING ON SIMACTIC PCS7 PROGRAMMING - CLJOC
Investor: Cuu Long JOC
Location: Ho Chi Minh City
Year: 2016
Scope: Training on SIMACTIC PCS7 Programming
TRAINING ON SIMACTIC PCS7 PROGRAMMING - CLJOC
Investor: Cuu Long JOC
Location: Ho Chi Minh City
Year: 2016
Scope: Training on SIMACTIC PCS7 Programming
SERVICE OF HENTING PROFESSIONALS FOR SUPERVISION AND MAINTENANCE
Customer name: BRANCH OF VICEM HA TIEN Cement Joint Stock Company - BINH PHUC Cement Factory
Industry: Cement
Location: Thanh Binh Hamlet, Thanh Luong Commune, Binh Long Town, Binh Phuoc Province, Vietnam
Project implementation time: 2023
UPGRADING 80T TRUCK SCALELAM DONG ALUMIN PLANT
Project Introduction:
- Phase out of the Siemens Simatic S5 for Cement Grinding control system required upgrading to S7 for continuing operation.
- Provided IO cabinets (1500 IOs) to replace the S5 PLC cabinets had been modified many times while operation.
REPAIR OF GEAR BOX FOR MILL AT HA TIEN 1 PHU HUU
Investor: Xi Măng Hà Tiên 1
Location: Phú Hữu, TP. Hồ Chí Minh
Year: 7/2016
PROJECT SUPPLYING 80T LORRY SCALES FOR HOA PHAT DUNG QUAT
Investor: Hoa Phat Dung Quat Steel Joint Stock Company
Project implementation place: Quang Ngai
Industry: Steel production
Year of implementation: 2022
PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT
Investor: Trung Nam Group (TNG)
Project implementation place: Ninh Thuan province
Industry: Seaport
Implementation time: 2022
CO2 MONITORING IN COAL GAS GENERATOR
Project information: Project: Monitoring CO2 in gas generators of Coal Gas workshop
Investor: Lam Dong Aluminum One Member Company Limited – TKV
Project implementation location: Bao Lam - Lam Dong Completion time: January 2022
AIR ANALYZER FOR CHIMNEY - VIETNAM SUGAR
Investor: Vietnam Sugar
Location: Khánh Hòa
Year: 2018
Scope: Supplied and installed air analyzer for chimney
CONTROL SYSTEM FOR COD ANALYZER - AGC
Investor: AGC Chemicals Company
Location: Phu My, Ba Ria Vung Tau
Year: 2016
Scope: Supplied and installed control system COD (Chemical Oxygen
Demands) Analyzer
CO2 MONITORING IN COAL GAS GENERATOR
Project information: Project: Monitoring CO2 in gas generators of Coal Gas workshop
Investor: Lam Dong Aluminum One Member Company Limited – TKV
Project implementation location: Bao Lam - Lam Dong Completion time: January 2022
CONTROL SYSTEM FOR COD ANALYZER - AGC
Investor: AGC Chemicals Company
Location: Phu My, Ba Ria Vung Tau
Year: 2016
Scope: Supplied and installed control system COD (Chemical Oxygen
Demands) Analyzer
PROJECT SUPPLYING 80T LORRY SCALES FOR HOA PHAT DUNG QUAT
Investor: Hoa Phat Dung Quat Steel Joint Stock Company
Project implementation place: Quang Ngai
Industry: Steel production
Year of implementation: 2022
AIR ANALYZER FOR CHIMNEY - VIETNAM SUGAR
Investor: Vietnam Sugar
Location: Khánh Hòa
Year: 2018
Scope: Supplied and installed air analyzer for chimney
PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT
Investor: Trung Nam Group (TNG)
Project implementation place: Ninh Thuan province
Industry: Seaport
Implementation time: 2022