DCS SYSTEM FOR BUT SON CEMENT PLANT

DCS SYSTEM FOR BUT SON CEMENT PLANT

Automation - Electrical Solutions

Investor: Vicem But Son Cement
Location: Kim Bang, Ha Nam
Year: 2016
Scope: Upgraded control system software CEMAT V7; Upgraded weight scale and flow meter systems.

Investor: Vicem But Son Cement
Location: Kim Bang, Ha Nam
Year: 2016
Scope: Upgraded control system softwareCEMAT V7;Upgraded weight scale and flow meter systems.

INTRODUCTION

Two production lines:
- Line 1: SIEMENS CEMAT V3.1,COROS-LSB, PLC S5
- Line 2: SIEMENS PCS7 V7.0, CEMAT V7.0, PLC S7
- ESTEC upgraded DCS system for line 1 from Cemat V3 to PCS7 V8.1 and CEMAT V8.1

CUSTOMER BENIFITS

Project was managed very well thanks to good cooperation between Vicem Butson, Siemens and ESTEC
- Upgrading successfully with minimum shutdown time.
- The scope of works had been done and delivered on time.
- 1/3 of the commissioning time has been saved (~2 weeks) thanks to good simulation test and good preparation and planning for commissioning
- New PCS7 and CEMAT V8.1 is very helpful for plant operation and management.