PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT
PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT
Investor: Trung Nam Group (TNG)
Project implementation place: Ninh Thuan province
Industry: Seaport
Implementation time: 2022
PROJECT SUPPLY 02 80T TRUCK BRIDGE FOR CA NA PORT
Investor: Trung Nam Group (TNG)
Project implementation place: Ninh Thuan province
Industry: Seaport
Implementation time: 2022
Project overview: Total planning area is more than 108 ha with main functional subdivisions including 02 wharves of 70,000-100,000 DWT. And a 20,000 DWT wharf with warehousing and service infrastructure. The designed capacity of cargo through the port is 3.3 million tons/year. The entire scale of the port after completion includes 17 berths, this is a later port with a convenient location throughout the country, aiming to be a transshipment location for the whole South Central Coast region. , Highlands.
ESTEC solutions provide: ESTEC provides 02 imported fully assembled Mettler Toledo 80T weighing systems using steel frames and concrete floors for port number 01 to serve the import and export process. The weighing system has high and very high accuracy, meeting all the most stringent requirements in terms of features, techniques, environment,... Designed to reach 20 years of working time: 350-700 full trucks/day.